The Mac Guys

"Over the next few weeks, John consulted with an architect in order to determine the correct size beam needed to replace the post. With the planning phase complete, the remodel began. The new LVL beam was installed in place of the old one and the post. The existing stairs were torn out and second floor landing rearranged in order to allow the bottom of the stairs to not extend so far into the sales floor. Now the passageway was wide enough to really allow proper access to the back part of the store. Now there was enough retail space to qualify to be an Apple Premier Partner."

Read the full interview here.